logo

Control Tower…..


The tower is positioned next to the slow down section and the yard and to allow the operator to view the entire layout; headsets provide communications to members positioned around the layout
Two 25-AMP BridgeWerks transformers provide track power to the main lines with enough power to run up to three trains on each line
Tower operators also have additional controls to manipulate switches at the entrances to the slow down for controlling train speed and parking trains on passing tracks